SPOKANE VALLEY

Sullivan
Road at the Spokane River bridges
– The northbound roadway is reduced to
one lane through mid-November.

WSDOT
I90/SR 904 Congestion- Expect congestion on I-90 and SR 904 between Spokane and Cheney Saturday as fans travel to and from the EWU football game.

I-90/Greenacres Interchange to Liberty Lake
Interchange-
On Tuesday, November 12, from
9 a.m. until as late as 5 p.m., westbound I-90 will be reduced to one
lane to repair median cable barriers.  On Wednesday, November 13, from about 7 a.m., until as late
as 3 p.m., eastbound I-90 will be reduced to one lane.  Expect slow traffic and congestion.  This work depends on weather and may be postponed
during snow and icy conditions.

SR 27/32nd Ave. to Trent Ave.- Grind out top layer of
roadway and resurface with Hot Mix Asphalt.  Construct ADA sidewalk ramps.

North Spokane Corridor/Francis Avenue Bridge and
Intersection Improvements-
Expect congestion and delays near the Francis Avenue/Market
Street intersection and the Francis Ave./Freya Street intersection as the finishing touches are put on the Francis Avenue Bridge over the BNSF railroad tracks.

US 195/Cheney-Spokane Road Interchange- Northbound and/or southbound lane restrictions.  The northbound left turn
lane is closed.  Northbound drivers need to use Qualchan Road to
access Cheney-Spokane Road.  The southbound off ramp to
Cheney-Spokane Road is now closed so drivers will need to be alert for
southbound highway traffic slowing to make right turns into Cheney-Spokane
Road.

SPOKANE COUNTY

Farwell Rd. from Market to North Spokane Corridor- Closed for fall.

Johnannsen Rd.- Closed from Prairie View Elementary School to Northview Lane for sidewalk installation and road widening.

SPOKANE CITY
Greene St. Bridge Project- Lane restrictions on the bridge and on Greene Street between South Riverton
Avenue and Upriver Drive. The work on the bridge will improve its load rating,
allowing larger trucks and loads to use the bridge. The project includes
installing fiber-reinforced polymer to the bridge deck and floor beams. 

2nd Ave. Driving and Parking Lane Closure- The northern most driving lane and parking lane will
be closed on 2nd Avenue just west of the Jefferson Street intersection starting November 11 through the 14th. 

17th Ave. Closure Sewer Repair Closure- 17th Avenue will be closed from Nov. 11 through 13t between South
Latawah Street and South Upper Terrace Road for sewer service repair
work.  Traffic from 17th Avenue will be detoured to 18th
Avenue.

Spokane Falls Blvd. Closure- Spokane Falls Boulevard from
Bernard to Washington is closed through November 15.  Detours direct
traffic to Riverside and Washington.  Bernard Street from Main
Avenue and Spokane Falls Boulevard northbound will be closed.  The work will add sewer and water line
connections to the Convention Center Hotel under construction.

Centennial Trail Closure- Part of the Centennial Trail
on the north side of the Spokane River from
Division Street east will be closed November 11 – 29. 
Pedestrians will be re-routed north on the sidewalk along the eastside of
Division Street and through the Red Lion Property.  The work will
remove and replace deck boards, fascia boards and pedestrian rails.

Main Ave. Closure- Main Avenue, just west of
Monroe Street, is closed for sewer line repair work. Vehicles have to enter
Peaceful Valley from the west, and Spokane Transit Authority
buses will also serve the area from the west.  The sidewalks along Main
will remain open, allowing for pedestrians and cyclists to access Peaceful Valley
from downtown on Main.

 

Liberty Street Construction- Construction to
rehabilitate Liberty from Oak Street to Ash Place and Ash Place from Liberty to
Dalton is starting.  The road is closed.

 