other on a map, check out SRTC’s 2015 Spokane Regional Construction Map here. The map is updated as new projects start and existing ones wrap up.
You may notice that projects underway now are more prominent while ones that will start later this construction season are more in the background.
SPOKANE CITY
Spokane Marathon Road Closures- The following closures and restrictions will
be in place on Sunday, Oct. 11:
o Spokane Falls Boulevard will be
reduced to one lane from Bernard to Stevens and closed from Stevens to Lincoln
6 a.m. – 10 a.m.
o Washington Street northbound will be
closed at Main Street from 6:30 a.m. – 9 a.m. There will be access to the Grand
Hotel parking garage
o Washington Street southbound will be
closed at North River drive from 6:30 a.m. – 10 a.m.
o Howard Street will be closed between
Main and Spokane Falls Boulevard from 6 a.m. – 10 a.m.
Bridge Avenue Closure- Bridge
Avenue will be closed between Lincoln and Monroe streets starting Monday, Oct.
12, and lasting four to five days. The work is needed in
advance of a 2016 project to install a combined sewer overflow (CSO) tank in
a gravel parking lot there.
Division Street Triangle- This project is for beautification
improvements to the entrances to the City. The right hand
lane heading west on Spokane Falls Boulevard is closed. Work is scheduled for completion October 22.
Maple Street Bridge Lane Closure- Lane restrictions are in place while crews work on the bridge.
Nevada Lane Closure- The western lane of
Nevada between Walton and Garland is closed until October 16 to
install speed monitoring cameras.
of Northwest Blvd between “A” and Audubon are closed until October 16 in
order to install speed monitoring cameras.
Avenue will have a grind and overlay between Lincoln and Monroe Street.
The road will be closed with a detour in place. The
Lincoln Street work northbound has switched over with the east side lanes being
closed for work at this time from 2nd to 4th
Avenues. Monroe Street work southbound continues along the east side from
2nd to 4th Avenues. The project includes reconstruction of the
street from 2nd to 4th Avenues and will replace the
asphalt surfacing, including ADA ramps as needed.
approximately a 5 week project.This project will complete a major bicycle
and pedestrian corridor. It will install missing bike lanes and sidewalks
along the entire corridor and make improvements to existing bike lanes.
hand turns permitted. Side streets are closed to through traffic. Improvements include preservation
treatments like crack sealing and grind and overlay. Pedestrian improvements include upgrades to ADA curb
ramps and minor curb and sidewalk repairs.
will reconstruct Rowan from Driscoll Blvd. to Monroe Street. The project
also includes installation of bike lanes, filling sidewalk gaps and replacing
water lines.
repairs. Erie is closed from 1st Avenue to the BNSF
overpass. This work will pave Erie from
1st Avenue to the BNSF overpass, which connects to the future
Martin Luther King Jr. Way alignment.
installation has begun from Crestline to Madelia. The Street is closed
with local access only. This
project is a residential grind and overlay pavement preservation project.
The work includes minor subgrade repair, crack sealing, ADA ramps, striping
and traffic control as necessary. Closure
of 1st Avenue will last through October. The corner of Napa and 1st
will be closed to traffic with a detour. This
project had delays due to an addition of a stormwater system.
main with CIPP (cured in place pipe) technology. This project will connect to a
future CSO tank at approximately Crestline Street and Riverside Avenue,
scheduled for 2017. There will be closures around the work zones
for CIPP installation equipment and bypass pumps.
section of traveled way, fill sidewalk gaps, replace curbing where needed and
install ADA curb ramps. The project will also include replacement of water
lines.
reconstruction, storm, sewer, swales, and water main replacement from
Bernard Street to Grand Boulevard. Construction is expected last
through the fall. The road is closed from Bernard Street to
Grand Boulevard with local access only. Storm and sewer work is underway.
replacement, complete sidewalk gaps and pilot project porous asphalt bicycle
lanes. This project will also include installation of a 36 inch water
transmission main between 37th Avenue and the Brown Park reservoirs
at 57th Avenue.
will begin on Main Avenue from Washington to Division Friday, October 9 through
Monday, October 12. Lane restrictions will be in place.
approximately one week; through Friday, October 16. This project is the removal and construction
of concrete curb, sidewalk and ADA curb ramps.
SPOKANE VALLEY
November.
weekdays from 7 a.m. until 7 p.m. until mid-October. Access from Long to
Sprague will be closed at times; detour via 2nd to Manifold.
Pedestrian detour will be posted.
November.
closed at times on weekdays from 7 a.m. until 7 p.m. until mid-October.
Detour via 2nd to Long. Pedestrian detour will be posted
Sullivan Road Bridge Replacement Project Area:
The southbound
Sullivan Road Bridge across the Spokane River is closed until Summer 2016 for
bridge demolition and replacement work.
Traffic remains reduced to one lane northbound and two lanes southbound.
Expect reductions at
times to one lane southbound Monday through Friday between 5 a.m. and 2:30
p.m.
Northbound traffic is
restricted to vehicles ten feet wide or less. Oversized vehicles should
use Barker or Pines as alternatives.
Turns from Indiana
onto northbound Sullivan are reduced to one lane.
WSDOT
9 a.m. until as late as 3 p.m., the westbound left lane will be closed for bridge joint repairs.
Westbound I-90 will be reduced to two lanes. Be
alert for slow traffic. No mainline freeway impacts.
southbound US 195 reduced to one lane in multiple work areas with slower traffic in order to rehabilitate the pavement. Some paving at intersections. A temporary speed reduction of 45 MPH is in effect for the
southbound lanes. Drivers should be alert for speed limit signage.
Interchange Bridge- On Thursday, Oct. 15, from about 3:30 a.m. until as
late as 8:30 a.m., the Medical Lake SR 902 bridge over I-90 will be reduced to
one lane with flaggers directing single lane, alternating traffic for bridge joint repairs. Expect delays and possible congestion on freeway
off-ramps. No mainline freeway impacts.
SPOKANE COUNTY
Old Trails/Inland Road- Crews are installing guardrails, sealing pavement and striping.
Elliot Road Culvert Replacement- Highway 206 is reduced to one lane near Elliot Road. Watch for equipment and workers.
Ladd Road– Under construction half a mile north of Thorpe Road. Watch for flaggers.