SPOKANE COUNTY
Road Bridge- Closed for demolition and replacement. A marked detour is in place.
Road Stormwater Retrofit (Upriver Dr. to Spokane River)- One lane traffic in each direction in order to upgrade stormwater facilities. Expect delays and find another route if possible.
Ave Sidewalks
(Harvard to Arden)– Rebuilding and adding sidewalks. Watch for flaggers.
Highway
(Jamieson to Freya & Windmill to Jamieson)– Pavement Removal and Replacement. 57th to Freya –Closed to
traffic with a detour in place.
Road
(Austin Rd. to Bernhill Rd.)- Still completely closed to repair storm washout.
Road
(Hazard Rd. to Austin Rd.)- Closed completely to repair storm washout.
Day Rd.)- Road closed to stabilize road embankment and replace asphalt. Project expected to take three weeks to complete.
Spokane Limit)- Possibly reduced to one lane for shoulder work. Watch for flaggers.
to Spokane County Line)- Possibly reduced to one lane for shoulder work. Watch for flaggers.
to Harvard and Molter to Starr)- Possibly reduced to one lane for shoulder work. Watch for flaggers.
Street will be Closed between Spokane Falls Boulevard and Bridge Avenue for
special events:
June 19, 9 a.m. – Terrain Bazaar setup
June 26 – Hoopfest (will close late Thursday evening and remain
closed Friday)
June 15, Asphalt grinding on Panorama Drive begins. There will be a short
duration with lane restrictions as the grinding moves along the
roadway. Water main
installation will also begin with Panorama Drive restricted to one lane
from Christi Ave to Palm Place.
main installation and storm water improvements in Cascade Way and Maple St are is closed from Panorama Drive to west of Maple
St. Maple St. is closed from Cascade Way to Sierra Way.This
project will replace cast iron distribution mains and repave the entire street.
remove and replace the sidewalk for the STA bus stop.
Cowley Street Closure- Northbound lane on
Cowley St. closed at 8th until Friday, June 19 to place aerial cable.
Springfield and Broadway until July 2 for new water and sewer
lines.
High Drive, Bernard Street to Grand Boulevard- The
road is closed as storm and sewer work is underway. This project includes pavement reconstruction, storm, sewer, swales,
and water main replacement from Bernard Street to Grand Boulevard.
gallon stormwater storage facility.
East Sprague Avenue Sewer Overflow Facility- North and southbound Sprague Way is closed to construct a combined sewer overflow facility on City property
across from the City’s Sewer Maintenance Facility. One lane will be open in each direction on E.
Sprague from Scott Street
to the Hamilton Overpass.
Argonne Road at Knox- Reduced to two lanes
in each direction around the clock through mid- to late June for reconstruction
of the roadway. Left turns are
prohibited in all directions at the Argonne and Knox intersection.
Argonne Road at Montgomery- The northbound right
lane is closed at the Argonne and Montgomery intersection. Pedestrians
should follow signs for the pedestrian detour route.
Broadway (from Fancher to Havana)- Limited to one lane in each direction around the clock
through mid-June. Access to businesses remains available.
Sands Road Bridge- Closed to all traffic at Chester Creek from 5 a.m. Tuesday, June 16 through 5 a.m. Thursday, June 18 for bridge overlay work. A detour via Schaefer Road will be posted.
Sullivan Road (from Sprague Avenue to Mission
Avenue)- Reduced to two lanes northbound and southbound around the
clock with curb-lane closures through mid to late-June for stormwater drainage
improvements and sidewalk work.
Sullivan Road Bridge Replacement Project Area- The southbound Sullivan
Road Bridge across the Spokane River is closed until spring 2016 for
bridge demolition and replacement work. All traffic is shifted onto the northbound
bridge with one lane northbound and two lanes southbound between Indiana
Avenue and the Sullivan Park traffic signal.
- Northbound traffic is
restricted to vehicles ten feet wide or less. Northbound
oversized vehicles should use Barker Road or Pines Road as alternatives. - Turns from Indiana Avenue onto northbound Sullivan Road
are reduced to one lane. - Construction vehicles
will be periodically entering and exiting Sullivan Road near the north and
south ends of construction zones.
University Road closure- Closed between 22nd and 27th avenues until the end of June for water main
work.
The following locations will be closed to traffic until September 2015 for water main work:
- 25th Avenue
(between Bowdish and University) - 22nd Avenue
(between University and Sunrise) - Sunrise (between
University and Chinook) - Chinook (between
Sunrise and Oberlin) - Oberlin (between
Chinook and 16th Avenue)
On all projects, signs and/or flaggers will
direct traffic through and/or around the work areas.
WSDOT
Sullivan road and Wellesley Ave. to drill test cores in preparation for paving. No Trent Ave. work scheduled this week.