Crews are suspending work for the season on the I-90/Latah Creek Bridge project. Minor items, including striping, will be underway this week as the roadway is prepared for winter. All lanes and ramps will be open for winter. The speed limit will be returned to 60 miles per hour. Work will resume in the spring to grind the pavement to remove studded tire ruts, repair cracked pavement, and resurface bridges.

Translate (Traducir/Перевод) »