SPOKANE VALLEY

4th Avenue between Progress and Sullivan – closed to
traffic from 7 a.m. Monday, July 29 until 5 p.m.Wednesday, July
31 for utility work.  Signs will redirect traffic via Progress, Sprague
and Sullivan.

Bettman Rd between 11th & 14th – Lane reductions from 7 a.m. to 5 p.m.
Mondays through Fridays through the end of August for storm water drainage
improvements.  At times, 12th Avenue traffic will be redirected via 8th
and Eastern.

Montgomery Drive just east of Pines – Lane reductions and
minor delays from 7 a.m. to 6 p.m. through Thursday, August 1 for utility
work. 

Portions of University Rd
between 4th and 16th –
Reduced to one lane
each way on Tuesday, July 30 and Wednesday, July 31 from 6 a.m. to
5 p.m. for utility work.  Expect congestion.

SPOKANE CITY

Market from Wellesley to Francis- Closed for the Hi Jinx Parade August 4 from 8 a.m. to noon. From noon to 4 p.m., Market from Wellesley to Joseph will be closed for a car show.

 

Spokane Falls Boulevard from Stevens to Post- Closed for the Color Run from 6 a.m. to 11 a.m.

 

Napa St. between East Trent Ave. and East Main Ave.- Closed bridge structure maintenance from 9 a.m. to 3 p.m. from Wednesday, July 24 to Tuesday, July 30.

 

Monroe St. Bridge- Traffic will be for reduced to one lane beginning at the Northwest end and finish in the southbound lane on Friday, July 26 for an inspection that starts at 7 a.m. and goes to 12 p.m.

Trent Ave. and Napa Street- Burlington Northern Santa Fe plans to start
work on a structure that crosses Trent Avenue just west of Napa Street. Traffic will be reduced to one lane each direction. Delays are expected between the hours of 7 a.m. and 3 p.m.  Alternative routes are
recommended.

Burgan’s Block on Division- Two southbound lanes will be closed Tuesday, July 30 from 7 a.m. to 3 p.m. for utility work near 1101 N. Division.


25th Ave. Construction- Work on 25th
Avenue from Freya Street to Rebecca Street continues for paving and curb repair
and sidewalk and swale installation.

Crestline Rehabilitation Project- This project will replace
a 24-inch steel water main with a 36-inch ductile iron water main in Crestline
St. from 57th Ave. to Thurston Ave. then continuing to 37th
Ave. via Stone and Lee Streets.  In addition, Crestline St. from 44th
to 53rd will be brought up to complete streets standards, including
curb, sidewalk, and storm drainage.

Third Ave. from Division to Arthur- Work to rehabilitate Third Avenue from Division east to Arthur
continues.  Sherman at 3rd street will be closed. 
Arthur will be the detour route.  The project also includes replacing
a 12-inch water main.  One lane of traffic remains open, and local access
to businesses is maintained.  Work will continue into October.

14th Ave. from Lincoln to Grand- The
project will rehabilitate 14th Avenue from Lincoln to Grand
Boulevard.

Euclid Ave. Water Main Replacement- One
lane open each direction from Napa to Crestline. The project will replace a 28-inch water
main with a 30-inch water main in Euclid Avenue.  The new main will begin
at Euclid & Mayfair and continue to Crestline, with a jog to the north
around Gonzaga Prep.

Rockwood Blvd. Rehabilitation- A
project to rehabilitate Rockwood Boulevard from Cowley to Southeast
Boulevard and Upper Terrace Road from Rockwood Boulevard to 17th Avenue
continues.  Base lift paving on Phase 1 is expected to be completed by the
end of next week.  Installation of catch basins has started on Phase 2
between Garfield and Cowley.  Traffic restrictions apply in those
areas.  Phase 1work continues on Rockwood from Southeast Blvd to Garfield
and on Upper Terrace Road.  Those sections are closed to through traffic;
local access will be maintained.

Springfield Lift Station- Springfield is closed between Columbus and Superior.  North bound
traffic on Columbus continues north to Cataldo.  South bound on
Superior is also directed to Cataldo.

WSDOT

I-90/SR 290-Hamilton Interchange- Beginning
Monday, July 29 through Friday, August 2, between the hours of 7 p.m. to as
late as 6 a.m., be alert for lane restrictions on the Hamilton
Street/SR 290 on and off ramps and Spokane River Bridge for striping.

US 2/SR 206-Mt. Spokane Park Drive Intersection- Beginning
Tuesday, July 30 through Friday, August 2, between the hours of 7 p.m. to as
late as 6 a.m., be alert for lane restrictions at this
intersection for striping.

SR 27/32nd Ave. to Trent Ave.- Be alert for
lane restrictions between 7 p.m. and 7 a.m.  Pedestrians also should be
alert for sidewalk restrictions when ADA ramp work is under construction or
curing.  Grinding operations and traffic loop installation is
underway.  Possible side road access restrictions during pavement grinding. 
Work on the I-90 Interchange bridge deck is expected to be underway July 29-30
during evening and overnight hours.

SR 291/Division Street to the Stevens County Line- Be alert for
lane restrictions between 7 p.m. and 6 a.m.  Pedestrians should be alert
for sidewalk restrictions near intersections when ADA ramps are under
construction or curing.  Grinding and/or paving work is underway at
multiple locations between Assembly St. and Division St.  All major
roadwork on this project will be underway during evening and overnight
hours.  Utility cover work is also underway.  No major daytime
restrictions planned.  Motorists should be alert for rough pavement in
some locations.

North Spokane Corridor/Francis Avenue Bridge and
Intersection Improvements-
Left turn movements at the
Market/Francis intersection are not allowed. Expect congestion and delays near the Francis Avenue/Market
Street intersection and the Francis Ave./Freya Street intersection. In addition, westbound
motorists on Francis should be alert for flaggers directing traffic near the
BNSF railway crossing.  The flaggers may be in place to make sure
westbound vehicles waiting for the traffic signal don’t block the nearby rail
tracks.  Drivers should be alert for trucks entering the roadway
and occasional train traffic that may cause delays. 

I-90/Division Street to Liberty Park- Be alert for lane restrictions with
mobile operations on I-90, both eastbound and westbound, in downtown Spokane,
during evening and overnight hours, Monday through Wednesday, July 29-31. 
There will be intermittent shoulder closures on I-90 between Division and
Hamilton during daytime hours.

US 195/Cheney-Spokane Road Interchange- Be alert for trucks crossing the highway during evening and
overnight hours.  Northbound US 195 is reduced to one through
lane in the vicinity of Cheney-Spokane Road.  Northbound drivers need to
use Qualchan Road to access Cheney-Spokane Road.  Northbound drivers
should be alert for possible congestion and slowing traffic.  The
southbound off ramp to Cheney-Spokane Road is now closed so drivers will need
to be alert for southbound highway traffic slowing to make right turns into
Cheney-Spokane Road. This is a long-term construction configuration. 

 

 
Translate (Traducir/Перевод) »