A reminder that guardrail painting starts tonight, and I90 between Coeur d’Alene and the Idaho-Washington line will be reduced to a single lane in both directions .
So as to minimize inconvenience to drivers, work will take place from 6 p.m. to 6 a.m. through Wednesday (Sept. 17) at the following locations:
– Tonight (Monday): West- and eastbound lanes at the Huetter, Atlas and Union Pacific Railroad bridges
– Tuesday (Sept. 16): West- and eastbound lanes at Idaho 41 Interchange
– Wednesday (Sept. 17): Any additional cleanup work at these locations
The speed limit will be reduced to 55 mph.