A project to resurface the concrete deck of the southbound Sullivan Road bridge over the Union
Pacific Railroad  tracks south of Marietta in Spokane Valley begins next Monday, August
12.  Work is expected to take about three weeks, winding up in
September. During construction, traffic across the bridge will be reduced to a single
lane in each direction. 

That means you can expect congestion and delays along Sullivan near the bridge. The project is 100% funded by a Federal Bridge Grant.

Translate (Traducir/Перевод) »