A project to rehabilitate Southeast Blvd. from 29th to Perry Street begins tomorrow, Tuesday, April 28.
The project includes replacing a distribution main from 29th Avenue to Rockwood Boulevard, one from Rockwood Boulevard, and one from 18th Avenue to Perry Street.
Southeast Blvd. from 29th Ave. to Rockwood Blvd. will be closed to traffic with local access only. Motorists will be detoured onto 17th Ave. to Ray St. to 29th Ave.
The $1.9 million project is being funded by the 10-Year Street Bond and Water Department.