The Washington State Department of Transportation has several projects starting next week. Here’s advance warning:

– On Sunday, May 17, from 6 a.m. until about 3 p.m., eastbound I90 in downtown Spokane will be reduced to two lanes for drain cleaning.

– Beginning Monday evening, May 18 at 7pm, work will begin on resurfacing I90 through lanes from Division Street to Havana Street. Drivers should expect lane restrictions, slow traffic, and congestion from 7pm to 6am.

– Beginning Monday, May 18, I90 will be reduced to one lane in each direction at Medical Lake-Four Lakes Road Bridges to remove existing bridge deck driving surface and replace with new concrete. This location is about ½ mile west of the Cheney/Four Lakes interchange.

Translate (Traducir/Перевод) »