WSDOT

North Spokane Corridor/Francis Avenue Bridge and
Intersection Improvements
– 
The right turn lane
for southbound traffic on Freya Street is closed to construct the
new roadway at the northwest corner.  All traffic movements are still be
allowed, but the right turn onto westbound Francis Avenue will need to be done
from the through lane.  This traffic configuration will remain in place through late
April, and will be restored once the asphalt paving is completed at this
location. 
Market Street has single lanes in each direction
through the Market/Francis intersection on the west half of Market
Street.  Francis Avenue is operating as single lanes in each direction on
the new bridge.  The south side of the bridge along the traffic barrier is
designated for the movement of bicycles and pedestrians.  No left turns
are allowed at the intersection from Market Street to Francis Avenue, but are
allowed from Francis Avenue to Market Street, and right turns are allowed on
all approaches.

SPOKANE VALLEY
Mirabeau Parkway between Pinecroft and Mansfield – Short closures of the southbound lane on Mondays through Thursdays from
6:30 a.m. to 5 p.m. for utility work continuing through
Thursday, April 24.

Park Road at Sprague Intersection – Expect closures north of
Sprague and south of Sprague at times from Monday, April 14 through early May
for resurfacing, depending on weather. Signs will redirect traffic to detours
via Vista/Broadway or Thierman/Appleway as appropriate.

Sprague Avenue from Vista to Park – Reduced to two lanes westbound
around the clock from 7 a.m. on Monday, April 14 through early May for
resurfacing, depending on weather. Signs will redirect traffic to detours via
Vista/Broadway or Thierman/Appleway as appropriate. 

SPOKANE CITY
Regal and Palouse Hwy Work Starts- Work started this week at the Regal Street and Palouse Highway Intersection to install a new traffic signal. Next Monday, April 14, includes minor traffic impacts for the construction
of a temporary detour to the west for Regal Street traffic.  This work
will require sidewalk closures, lane closures, and other minor temporary
traffic revisions.  This will also include at times, no direct access
to the existing parking lot for the Park on the Westside of this
intersection. 
o   Starting
Sunday Night, April 13, 7 p.m. the contractor will start the second phase which
will include major traffic impacts at this intersection.  Regal Street
traffic will be re-routed to the new temporary roadway alignment to the
west.   This new temporary roadway will allow for northbound and
southbound thru movement at Palouse Hwy and access to the existing parking lot
on the Westside to southbound traffic only.  This new alignment
will include curves with an advisory speed of 20 MPH in the construction
zone.  Traffic using the new temporary roadway will have no direct
access
to Palouse Hwy. 
o   The
Palouse Hwy will be closed to all traffic just east of Regal Street and will
have no direct access to Regal Street. The traffic control will maintain
local driveway access to all businesses that use Palouse Hwy between Regal
Street and Freya Street.  All Palouse thru traffic will be re-routed using
established marked detours starting at the intersection of Palouse Hwy and
Freya Street.
Francis Ave. Construction- Work started this week to rehabilitate Francis Avenue from Division to Crestline
Streets.  The work is curb to curb and includes installation of ADA curb
ramps, where needed.
Cedar Rd. Lane Reduction-   Flagging
of both directions of traffic will occur on 5555 South Cedar Road , through Monday April 14.  The one lane, two way traffic control
is for onsite work installing electric services.
Cedar Rd. Grind and Overlay– A grind and overlay will begin on North Cedar road
April 14. There will be flagging and road closures as needed. 
·       Wall Street Closure- Wall street will be closed the afternoon of Saturday, April 12 for an after party to thank volunteers who participate in Cleaning from the Core. Over 400 volunteers will be in the downtown area painting, planting, and
various other activities to clean up and freshen the downtown from the long
winter.

Translate (Traducir/Перевод) »