Division Sidewalk Closure- The sidewalk closure at 1120 N. Division has
been extended until Sept. 30 for demolition work.
Railroad Crossing Closure- BNSF crews will be working on the rail crossing
at Regal/Nelson Street Wednesday, Oct. 1. Nelson at
Desmet will be closed. Access to Nelson will be restricted southbound.
Ruby Lane Closures- Two eastern lanes on
Ruby at Boone will be closed Sept. 29 to Oct. 3 to install a flashing crosswalk system.
Residential Grind and Overlay Project- Crews are working on the Excell Ct. section, getting ready to pave. Workers have also begun removals and stormwater
structure installs on Arthur Street from 13th to Newark Avenues.
There will be limited local access. The project calls for
completion of grind and overlay repair on the following streets:
Street from Heroy Avenue to Wellesley Avenue and Heroy Avenue from Helena
Street to Pittsburg Street. Work is substantially complete.
Street from 13th Avenue to Newark Avenue (excluding 9th
Avenue west to 9th Avenue east)
Avenue from G Street to the beginning of the cul-de-sac east of Audubon Drive.
Removal work has begun.
will be open each direction on Sprague from Hatch to Scott Streets. This project will construct a combined sewer
overflow facility on City property across from the City’s Sewer Maintenance
Facility.
access on Addison as work grind and overlay work continues. Crews will also replace a steel water main
with ductile iron in Calispel Street from Wellesley Avenue to Queen Avenue.
8-inch water main in Kendick Ave. from approximately 1,200 feet west of Nine
Mile Road to Nine Mile road. Traffic control is in place with road closure
signs at both ends. Detour signage is in place on State Route 291.
Avenue to Carlisle Avenue will be reduced to one lane each direction
until late October. Carlisle at Greene will also be closed and a
detour put in place. This
project is for work on the existing 30” steel water main that is suspended
under the bridge. This project will pull a 24” pipe through
the existing 30” main. The new pipe will not add weight to the bridge due
to the smaller amount of water that will flow through the new pipe.
Bernard Street. Phase One construction is expected to last until mid-October.
Phase Two of this project, Bernard Street to Hatch Road, will begin in the
spring of 2015.
construction mainly from Division Street to Nevada. Asphalt patching behind
sidewalks is wrapping up. This
project will rehabilitate Francis Avenue from Division to Crestline
Streets. The work is curb to curb and includes installation of ADA curb
ramps, where needed.
a.m., Monday through Friday, be alert for lane restrictions for
lane striping.
Improvements- A lane closure on northbound Market Street near the intersection with Francis
Avenue will be needed all day on Monday 9/29. The southbound Market Street
left-turn lane will be closed all day on Tuesday 9/30 and the southbound
right-turn lane on Freya Street will be closed in the morning on Wednesday
10/01. The remainder of the week will consist of intermittent short-term lane
closures at both intersections and along Francis Avenue.
SPOKANE COUNTY
Bruce Road Bridge- Closed to be replaced.
Country Homes Boulevard- Southbound lanes closed from Cedar to Wall streets.
Shady Slope Road- Bridge is closed and a detour in place between Leona and Little Spokane Drive.
Wandermere Pathway from Dartford south to the Children of the Sun Trail- Construction begins Monday, Sept. 29 on work on the pathway, shoulder and guardrail. Expect delays. There will be flaggers directing traffic.
SPOKANE VALLEY
October 1 for paving and utility work. Signs will redirect traffic via
Appleway, Mullan, and Park.
Vista Road at the BNSF tracks (south of Trent
Rd)– Beginning Wednesday, October
1 there will be a narrowing of lanes for sidewalk and median curb installation.
Hours of work are 7 a.m.-5 p.m.
Appleway Boulevard from Thierman to Park- Reduced to two lanes through
early October for landscaping improvements. The new sidewalk on the south side
of the road will be available for pedestrian use for the remainder of the
project.
Eastbound and westbound East Indiana Avenue
from Sullivan Road to East Desmet Court
– Beginning Monday, September 29 to Friday, October 3 alternating left and
right lane closures for pavement marking modifications and installation of
project traffic control signs. Hours of work are 7 a.m.-3:30 p.m.
Northbound Sullivan Road from I-90 to East
Flora Pit Road – Beginning Wednesday,
October 1 to Friday, October 3 from 7 a.m.-3:30 p.m., the right lane will be closed
for installation of project traffic control items.