For more information on all the projects below, and to see them in relation to each other on a map, check out SRTC’s 2015 Spokane Regional Construction Map here. The map is updated as new projects start and existing ones wrap up.

You may notice that projects underway now are more prominent while ones that will start later this construction season are more in the background.

WSDOT

SR 206/Bruce Road to Mt. Spokane State Park Gate- Be alert for long delays with flaggers and/or pilot cars directing
single-lane, alternating traffic as crews repair pavement and do shoulder work. NOTE:  When loose gravel is
present on the roadway, the legal speed limit will be reduced to 35 mph. 
Drivers should be alert for speed limit signage.
US 2/Lawson Street Intersection in Airway Heights- Tonight, Thursday, July 16, from
about midnight to as late as 5 a.m. on Friday morning, be alert
for a dark traffic signal at Lawson Street as Inland Power and Light conducts a scheduled power outage. Treat this
intersection as a 4-way stop.
US 195-Southbound/I-90 to Excelsior Road- Be alert for
southbound US 195 reduced to one  lane in multiple work areas with
possible slower traffic as crews repair pavement.  
SR 290-Trent Ave./Sullivan Road to Idaho State Line- Be alert for
daytime lane restrictions between Sullivan Road and Wellesley Ave. for paving on Trent Ave. and utility work on Sullivan. In
addition, watch for lane restrictions on Sullivan Road between
Trent and Wellesley. No paving work is currently scheduled between
Wellesley and the Idaho state line.
SR 27-Pines Road/BNSF Crossing Repair- On Wednesday and Thursday,
July 29 and 30, be alert for a full closure of SR 27/Pines road
at the BNSF mainline crossing at Trent in order to make repairs.  Exact hours are not yet set.

SPOKANE VALLEY

Argonne
Southbound between Trent and Montgomery –
Reduced
to two lanes around the clock. Sidewalk on the west side is closed with a posted detour.
Houk
from Mission to Maxwell –
Closed through late July for roadwork. Local access remains available via
Maxwell, Mission, and Vercler.
Montgomery
Westbound just west of Argonne –
Reduced
to one lane through the end of the week.
Mansfield
at Houk intersection –
Narrowed
lanes for utility work through late July.
Maxwell
from Pines through the Houk intersection –
Open
to traffic to the Valley Hospital.
Sinto
from Pines through the Houk intersection –
Closed
to traffic through late July. Local access remains
available via Maxwell or Mission and Vercler.
Sullivan
from Sprague to Mission
– Reduced
to two lanes in each direction from 6 a.m. to 9 p.m. through late July with
occasional reductions to one lane between 9 p.m. and 6 a.m.
Sullivan
from Trent to Wellesley –
Reduced
to one lane in each direction through late July, except for
the following closure: Sullivan from Trent to Wellesley, and Wellesley from
St. Charles through the Sullivan intersection
– Closed to all traffic
overnight on Monday, July 20 from 10 p.m. to 1 a.m. for paving.  Detours
via Progress or Flora will be posted. 
Sullivan
Road Bridge Replacement Project Area- 
The southbound
Sullivan Road Bridge across the Spokane River is closed until spring 2016 for
bridge demolition and replacement work. 
Traffic remains reduced to one lane northbound and two lanes southbound. Expect periodic 2-3
hour reductions to one lane southbound at varying times throughout the week. Turns from Indiana
onto northbound Sullivan are reduced to one lane.
The
following locations will be closed to traffic  until
September 2015 for water main work:
·        
25th Avenue
(between Bowdish and University)
·        
22nd Avenue
(between University and Sunrise)
·        
Chinook (between
Sunrise and Oberlin)
·        
Oberlin (between
Chinook and 16th Avenue)
·        
Sunrise (between
University and Chinook)

SPOKANE CITY
North by Northwest filming in Spokane- 


Sunday, July 19
– 4 a.m. to 2 p.m.,
Normandie Street will be closed between Providence Avenue and Gordon Avenue.


Monday, July 20
– 4 a.m. to 2 p.m., Main
Avenue will be closed between Division Street and Pine Street.
– 9 a.m. to 3 p.m.,
Washington Street between Riverside Avenue and Sprague Avenue will be closed.
There will be sidewalk closures on Sprague Avenue as well.


Tuesday, July 21
– 4 a.m. to 10 p.m., Main
Avenue between Post Street and Stevens Street will be closed. Howard Street
from Spokane Falls Boulevard and Riverside Avenue will also be closed during
this time.


Wednesday, July 22
– 4 a.m. to 10 p.m., 1st
Avenue between Adams Street and Monroe Street will be closed. Adams Street
between Sprague Avenue and 2nd Avenue, Jefferson Street between
Sprague Avenue and 2nd Avenue and Madison Street between Sprague
Avenue and 2nd Avenue also closed during this time.
– 4 a.m. to 11 a.m., there will be
sidewalk closures and no parking along the west side of Lincoln Street between
Railroad Alley and Steam Plant Alley. Also, sidewalk and no parking along the
east side of Monroe Street between The Old Spaghetti Factory and the Brooklyn
Deli.


Friday, July 24
 4 a.m. to 2 p.m., Cedar
Street from 2nd Avenue to 1st Avenue and 1st
Avenue and Sprague Avenue. The intersection of 1st Avenue and Cedar
Street will have closures during filming and flaggers used.
– 10 a.m. to 10 p.m., Main
Avenue between Bernard Street and Division Street will be closed.


Saturday, July 25
– 4 a.m. to 10 p.m., Erie
Street between Front Avenue and 1st Avenue. North Sprague Way and North Sprague Access will be closed. However, East
Sprague will not be closed. 

Spokenya Run Stoppages- Saturday, July 18 from 9-11 a.m., there will be runners in the area around Spokane Falls Community College and Life Center Church and temporary traffic stoppages to allow runners to cross at Ft. George Wright and Government Way.

Underhill Combined Sewer Overflow Tank Construction- Thor Street will be closed from Hartson Street to 29th
Avenue starting Friday, July 17 6 p.m. to Sunday, July 19, opening in the
evening for the Monday morning commute.
Freya Street will be closed from Hartson Street to 29th
Avenue starting Tuesday, July 21, 6 a.m. through the end of August.

This project will construct a combined sewer overflow facility under
the parking lot at Underhill Park.
High Drive and Hatch Road Major Work Getting Underway in 43rd Monday, July 20- This
project will construct three Combined Sewer Overflow (CSO) storage facilities
with an in-line storage configuration. 43rd
Ave. from Grand to Garfield St. will be closed to thru traffic for 40 working
days starting Monday, July 20. 

Residential Chip Seal Program Starts Monday, July 20- This project will be in three different district locations. District one, Regal
Street from Rowan Avenue to Francis Avenue; District two, 33rd Avenue
to 36th Avenue from Grand Boulevard to Perry Street; and, District
three, Elm Street from Broadway Avenue to Boone Avenue. Chip
sealing will consist of one-fourth chip repairs and a fog seal. This project
also includes minor pavement repair and crack sealing.
Washington Street Closure- Full closure Sunday, July 19, from
Sprague to Riverside for Avista utility work.  Washington will re-open
Monday, July 20, at 6 a.m.  The detour route will be 1st
Ave. to Bernard and Bernard to Riverside Ave.  One lane will be left
open at Sprague Avenue for westbound traffic.

Taft Closure- Taft Street between Elmhurst and Holyoke is closed until Monday, July 20 for sewer relay and repair.

Lidgerwood Lane Closure- The
western lane of Lidgerwood, north of Francis, is closed until Friday, June 24 to place
conduit and fiber.

Spokane Falls Boulevard Lane Closure- The
northern lane of Spokane Falls Blvd. west of northbound Division will be closed from Monday,
July 20 until Sunday, September 20 for work on the right-of-way
triangle.

Heroy Avenue Closure- The
2300 block of Heroy Avenue is closed until Tuesday, July 21st for
the installation of new water and sewer taps.

High Drive Project Continues- High Drive is closed from Bernard Street to Grand Boulevard with storm and sewer work underway. This project includes pavement reconstruction, storm, sewer, swales,
and water main replacement from Bernard Street to Grand Boulevard. 

Havana Street from Glenrose to 37th- Glenrose Road from 57th Avenue to
Havana Street is closed. Work has begun at the intersection of
Freya and 44th with traffic and pedestrian improvements. Traffic
will be impacted on both streets and controlled by flaggers and signs. Improvements include full width pavement
replacement, filling sidewalk gaps and installing bicycle
lanes.  

Arterial Curb Ramp Projects- Installation of ADA-compliant curb ramps at each intersection
corner ahead of the City of Spokane scheduled street maintenance grind and
overlay projects. This project is funded with local funds.

o   Construction on Grand Blvd at
intersections from 23rd Avenue to 28th Avenue is
completing.
o   Mission Ave. from Division St. to Maxwell begins Monday, July 20.

SPOKANE COUNTY

Christensen
Road Bridge-
Bridge closed to demolish and replace it. A marked detour is in place.
Wellesley
Ave. Sidewalks
 (Harvard to Arden)– Rebuilding & adding sidewalks, watch for flaggers.
Palouse
Highway

(Jamieson to Freya & Windmill to Jamieson)- 
Pavement Removal and Replacement. Speed and lane restrictions are in place.
Old
Trails/ Inland Road- 
Widen and pave both Old Trails Road and Inland Road. Road Open, No Restrictions for the Dirty Dash Mud Run event this Saturday. Starting Monday, July 20, the road will be closed. Riverside State Park will remain open. Visitors can access the park from the north at the Seven Mile Road/Inland Road intersection.
Translate (Traducir/Перевод) »