SPOKANE COUNTY
Market Street, Houston to Lincoln– Installing curb, sidewalk, ramps, catch basins, drywells, Swales, sewer pipe, repair & replace asphalt. Roadway is one lane each direction on the east side of Market. Work continues on the west side of Market. Work continues through August 18.
Monroe Street Improvements, Francis to Greta- Removing/abandoning existing drainage structures, installing catch basins, pipe, sidewalk, curb, re- constructing a traffic signal, asphalt grind, repair and repave. Restrictions at the intersection of Francis and Monroe through the end of August.
Ritchey Road Bridge, Bannock Avenue to US 2- Removal of the existing bridge & Replace with new structure. Bridge is open, crews still working on the shoulders of the road, so possible delays & flaggers through the end of August.
Trails Road, from Hayford Road to Old Trails Road- Grind existing asphalt, add turn lane at Flint Road, paving, and striping. During Daytime hours road will be one lane with flaggers and a pilot car directing traffic through the end of August.
Hayford Road, Entrance to Northern Quest Casino to Northern Quest Drive- Traffic will be stopped from 10 a.m. to 10:30 a.m. today, August 14 for blasting work.
57th Avenue, Magnolia Street to Pittsburg Street- Westbound right lane and sidewalk closed on north side of 57th between Magnolia & Pittsburg until August 15.
29th Avenue, Custer Lane to Spokane City Limits- Road closed for rock excavation, stormwater improvements, road widening and sidewalks through August 14.
SPOKANE VALLEY
12th AveNUE, Bowdish Road to Wibur Road- Sidewalk project. Full road closure 7 a.m. to 5 p.m. dailyt through the end of August.
Bowdish Road, 12th Avenue to 8th Avenue- Sidewalk project. Full road closure daily from 7 a.m. to 5 p.m. through August 31.
Euclid Avenue between Tschirley Road and Barker Road- Road/sewer project. Full road closure around the clock through late September. Detour sign posted.
Saltese Road, 16th Avenue to 24th Avenue- Street Preservation Project. Full road closure from 7 a.m. to 5 p.m. daily through the end of September.
Sullivan Road and Euclid Avenue Intersection- Reconstructing intersection with concrete. The northwest corner of the intersection will be closed until late August. Traffic will be detoured via Marietta Ave. Expect delays.
WSDOT
US 2/STEP Access Roundabout-West end of Airway Heights- Construct a new roundabout intersection to the west of Craig Road for access to the new Spokane Tribe STEP development and add improvements at the Craig Road intersection. Some work starts today, Thursday Aug. 10. Major work scheduled to begin on Monday, Aug 14.
US 2/Francis Ave to Division Wye- Asphalt paving and sidewalk ADA improvements. Crews will continue milling and paving at night with some daytime work. Be alert for nightly dual lane closures and sidewalk restrictions. Daytime lane restrictions occur northbound 6 a.m. to 3 p.m. and southbound 10 a.m. to 7 p.m. Nighttime lane restrictions occur 7 p.m. to 6 a.m., all directions.
I-90 Eastbound/Liberty Lake Interchange- Liberty Lake Road restoration. Be alert for congestion and delays at the I-90 eastbound on and off ramps, Appleway, and Liberty Lake Road intersection. Work hours are 7 p.m. to 5 a.m.
US 195/Colfax to Spangle, Passing Lanes- Add two passing lane segments, one northbound and one southbound, in the vicinity of Steptoe. Be alert for flaggers and pilot cars directing single-lane, alternating traffic. Work hours are 6 a.m. to 6 p.m.
SR 290/Mission to Sullivan Road- Asphalt paving and bridge deck repair. From about 7 p.m. until as late as 6 a.m., mainline grinding and paving will be underway. Expect lane restrictions with slow traffic and possible congestion.
NSC-US 395/North of Spokane River- North of the Spokane River adjacent to Greene Street between Jackson and Marietta Avenues, the City of Spokane is placing surplus fill material for future NSC construction.
SR904/Mullenix Road to Betz Road- Asphalt paving and sidewalk ADA improvements. Be alert for lane restrictions.
SPOKANE CITY
37th Avenue, Regal Street to Custer Street- 37th Avenue is closed between Regal Street and Ray Street to reconstruct the roadway, build curbs, sidewalks, bike lanes and stormwater piping. A detour route is marked.
Adams Street Combined Sewer Overflow (CSO) 24 Project- This project will construct a 2.4 million gallon Combined Sewer Overflow Tank (CSO) tank and piping. Here’s how it affects traffic:
Adams Street between 1st and Sprague Avenue is reduced to one lane on the east side of the road. There is no on street parking.
1st Avenue is reduced to one lane eastbound in the furthest south lane. There is no on street parking from Cedar to just short of Jefferson Street.
- Sprague Avenue is closed to all westbound traffic from Jefferson to Cedar. Local access only will be provided for adjacent parking lots and KHQ’s parking garage. Eastbound traffic is permitted on Sprague Ave from Adams to Jefferson (within the restricted area similar to Phase 1) for local residents and KHQ employees only. No on street parking is permitted from Jefferson to Cedar Street.
- Westbound Riverside is open to traffic and serves as the detour route for the Sprague Ave. closure.
- Eastbound Riverside is closed from Cedar to Jefferson Street. Local access and parking is permitted via westbound Riverside.
Barnes Road from Strong Road to Phoebe Street- Strong Road from Rustle to Phoebe is closed to traffic. This project includes installation of a 12-inch water line, new pavement, curb, sidewalk and drainage facilities.
Division Street Gateway Project, 3rd Avenue to Spokane Falls Boulevard- This project includes electrical conduit replacement, stormwater updates, asphalt patching, curb and sidewalk replacement and landscaping. Lane closures along the west side of Division and Browne Street from Sprague to Spokane Falls Boulevard.
Residential Chip Sealing- From Monday, August 14 to Friday, August 25 crews will begin a residential chip and seal project on Addison Street from Rowan to Wabash and Princeton to Empire. Phase 1 work consists of patching and crack sealing the entire width of the road. The street will be closed to through traffic and detours will be in place.
Street Maintenance Grind and Overlay Work- Crews are starting work on a grind and overlay project on Assembly Street from Rowan to Francis Avenue.
Hayford Force Main Replacement/West Plains Chlorine Injection Station– This project includes replacing PVC with ductile iron pipe and construction of a chlorine injection station. Hallett Road between Thomas Mallen Road and Westbow Road is closed with a marked detour.
I-07C and CSO 34-1 Control Facilities- Riverside Avenue between Magnolia and Napa Street will be closed starting Thursday, August 10. I-07c work is to construct a 200,000 gallon Combined Sewer Overflow Tank and CSO 34-1 work is to construct a 1.5 million gallon CSO tank.
Liberty Park Combined Sewer Overflow Tank 33-1- Traffic impacts on 5th Ave. from Arthur to Perry and Denver and Celesta. This work is to construct a 2 million gallon Combined Sewer Overflow Tank that is part of the “It’s all about the River” program to keep the river clean.
Monroe and Lincoln Street, Main Avenue to 2nd Avenue- Final paving is complete on Lincoln and Monroe Street between Main and 2nd Avenue. Crews are working on minor finishing touches. Expect some lane restrictions for this work. Two lanes will be maintained throughout the work, as well as east-west access through intersections.
This is a full depth roadway replacement and full depth replacement between curbs on Lincoln Street and Monroe Street; Main Avenue from Monroe Street to Lincoln Street; and Monroe Street from Spokane Falls Boulevard to Main Avenue. Some minor curbing and ADA curb ramps will
Sewer Department Work- Browne Street between 5th and 6th Avenue is closed to accommodate a new Providence Behavioral Health Center under construction on at the former site of the Fifth & Browne Medical Building. Traffic is detoured to use Division and 7th Avenue.
Spokane Falls Boulevard Combined Sewer Overflow Tank (CSO 26) Project– Significant downtown traffic changes on Spokane Falls Boulevard and Lincoln Street have started to accommodate construction of a 2.2 million-gallon concrete CSO tank across from the Downtown Library. Spokane Falls Boulevard from Lincoln to Monroe is closed to traffic. Lincoln Street from Spokane Falls Boulevard to Main is open with traffic redirected southbound. Lincoln is the detour route for traffic coming from the River Park Square garage and Spokane Falls Boulevard for this phase of the project which is expected to be completed mid-2018. Lincoln has two lanes of traffic, and drivers are required to go east or west at Main Avenue. Until Monday, August 21 the right hand lane of traffic where Spokane Falls Boulevard turns onto Lincoln is reduced to a single lane.
Sprague Avenue, Helena Street to Stone Street– Phase I of this project, Sprague Avenue between Altamont to Napa, is now open to traffic. Crews are focusing on phase II of this project, Sprague Avenue just west of Napa to just west of Helena. Work for this project includes a full street reconstruction, partial sidewalk replacement, bumpouts, landscaping, pedestrian lighting, and utility replacement.
TJ Meenach Combined Sewer Overflow Tank, CSO I-03– Construction on this CSO tank located to the east of TJ Meenach Drive, below Northwest Boulevard continues. TJ Meenach Drive is closed from Northwest Boulevard to Pettit Drive until approximately Friday, September 15. TJ Meenach from north of the bridge to Northwest Boulevard will be closed until late August. This project will construct a 1.4 million gallon Combined Sewer Overflow Tank (CSO) tank.
Upriver Drive Combined Sewer Overflow Tank, CSO 41– Upriver Drive is open from west of Freya to east of Rebecca. Rebecca remains closed to from Upriver Drive to south of Ermina for work on the CSO Tank. A detour is in place for the Centennial Trail.
Trent Avenue Paving, Mission Avenue to Sullivan Road- WSDOT is working on a paving project on Trent Avenue from Mission to Sullivan Road. Crews will be working night shifts from 7 p.m. to 6 a.m.