The Post Street bridge was determined to be “structurally inadequate” in 2015, but plans to fix it will have to wait. The Spokesman Review reports that cost estimates are over budget and so plans will be re-evaluated. The City Council will continue to discuss options in the meantime. post-street-bridge-construction-pushed-back Spokesman Review photo

Translate (Traducir/Перевод) »