Ramp paving continues tonight, weather dependent, on segments of on and off ramps leading to and from Spokane International Airport on US 2 and Sunset Hwy. 
Listed
below is the current plan for the remaining series of on and off ramp closures for paving. During
the following days and hours, single-lanes will be fully
closed for construction. Detours will be in place. Expect delays and allow
plenty of time to reach your destinations during these periods to avoid
missing flight connections.
Letters
in parentheses correspond to ramp location on diagram.

 Wednesday evening, September
3 into Thursday morning, September 4
7 p.m. until as late as 5
a.m.
(C) Westbound off-ramp from US
2 (& I 90 Spokane) to Westbound Airport Dr. (to the airport) Paving within
the multiple lane portion
(D) Eastbound Airport Drive
(from the airport) to US 2 (& I 90 Spokane) Paving within the multiple lane
portion.

9 p.m. until as late as 5 a.m.
(G)-Eastbound US 2 off-ramp to
Westbound Airport Dr. (to the airport)—Closed for paving of (C).(F)-Westbound Sunset Hwy. to
Westbound Airport Dr. on-ramp (to the airport)—Closed for paving of (C).
Thursday evening, September 4
into Friday morning, September 5
7 p.m. until as late as 5
a.m.
(C) Westbound off-ramp from US
2 (& I 90 Spokane) to Westbound Airport Dr. (to the airport) Paving within
the multiple lane portion
(D) Eastbound Airport Drive
(from the airport) to US 2 (& I 90 Spokane) Paving within the multiple lane
portion
Midnight until as late 5
a.m.
(D)-Eastbound Airport Drive
(from the airport) to US 2 (& I 90 Spokane)—Closed for paving the single
lane portion

Friday evening, September 5
into Saturday morning, September 6
7 p.m. until as late as 4
a.m.
(B)-Westbound US 2 off-ramp to
Westbound Sunset Hwy.—Closed for paving
9 p.m. until as late as 5
a.m.
(A)-Westbound Sunset Blvd. to
westbound US 2 on-ramp—Closed for paving
(E)-Eastbound Airport Drive off-ramp to Eastbound
Sunset Hwy. (to Spokane)—Closed for paving

Monday evening, September 8
into Tuesday morning, September 9
9 p.m. until as late as 5
a.m.
(G)-Eastbound US 2 off-ramp to
Westbound Airport Dr. (to the airport) or Eastbound Sunset Hwy.—Closed for
paving
(F)-Westbound Sunset Hwy. to
Westbound Airport Dr. on-ramp (to the airport)—Closed for paving
In addition, between
the hours of 7 p.m. and 5 a.m. paving operations will be scheduled for ramp
segments with multiple lanes.  The affected ramps will remain
open
with traffic reduced to one lane.  Expect delays between the
hours of 7 p.m. and 5 a.m.  

Translate (Traducir/Перевод) »